Skip to content
Disturbed asbestos? Call now, we answer 24/7 Open 24/7 (631) 230-6066
Commack Asbestos Removal logo

Houses and business properties

Asbestos Removal in Commack, NY

We build a sealed plastic room around the material, take it out soaking wet and only hand the space back after the air passes.

Worker in a full protective suit and respirator outdoors

What Separates a Careful Removal From a Risky One?

If asbestos tile can sit under a carpet for decades without bothering anyone, why does taking it out call for a licensed crew? Because the hazard is in the breaking, not the sitting. Prying, scraping, sawing or sanding turns a solid material into airborne fibers that drift down hallways and settle into rugs, ducts and closets. Everything about a careful removal is designed around keeping that from happening. At Commack Asbestos Removal, the first step is knowing for certain which materials contain asbestos, so the job is sized by lab results. Next comes the enclosure: heavy poly over floors and walls, every vent and register taped shut, a zippered doorway and HEPA scrubbers that keep the inside at lower pressure than the rest of the house. Inside that room, licensed handlers soak each piece with amended water before it comes loose and drop it straight into sealed, labeled bags or wrapped bundles. After the material is gone, every surface is HEPA vacuumed and wiped wet, then a separate firm samples the air. The plastic stays up until those results pass. Most removals we do are the first step of something else: a kitchen gut, a basement finish, a boiler swap, a listing or a teardown. Plenty of Commack houses were built when these products were simply what builders used, so the subject tends to surface the week demolition is supposed to start. Our part is getting the material out without spreading it, so your contractor can pick up where we leave off.

Which Materials Come Out Most Often?

These are the usual suspects in older Long Island houses and commercial spaces. Each one is removed inside a full enclosure.

  • Boiler jackets and heat pipe wrap

    Chalky white lagging on pipes, elbows and the boiler itself, typically removed before new heating equipment goes in.

  • Vinyl squares and black glue

    Old floor tiles and the tar-colored adhesive underneath, lifted while damp to make way for new flooring.

  • Spray-on ceiling texture

    Popcorn and acoustic finishes scraped down with the entire room wrapped in plastic.

  • Wallboard mud and old plaster

    Finishes in walls and ceilings that need to go before rooms are opened up or rearranged.

  • Cement siding and roof shingles

    Exterior shingles lifted off whole whenever possible, kept wet and wrapped for the landfill.

  • Ductwork tape and insulation

    Wrapping on older ducts and seams, taken off ahead of a new HVAC installation.

  • Before a sale or a teardown

    Material cleared so a closing or a demolition permit is not held up by it.

  • Records for your file

    Air test results and landfill paperwork you can pass along to a buyer, builder or inspector.

What Does Removal Day Look Like?

  1. Know first, then plan

    Any suspect material without a lab result gets sampled. Then you receive a plan on paper covering which pieces come out, how the enclosure goes up, which landfill takes the debris and how the final air test is run.

  2. Enclose and take it out

    Plastic goes up, openings are taped shut and the HEPA scrubbers start. Licensed handlers soak each section, remove it and seal it in tagged bags or wrapped bundles without carrying anything past the plastic doorway.

  3. Wipe down and test the air

    Inside the enclosure, every surface is HEPA vacuumed and then wiped wet. Air samples are collected by an independent company, and the poly stays in place until they pass, so whoever comes next walks into a clean room.

Why Let Us Handle Your Removal?

  • Lab results set the scope

    Squares that come back negative are just old flooring, and they stay off the asbestos part of your bill.

  • Fibers stay inside the plastic

    Lower air pressure and taped openings mean nothing seeps into the hall, the stairs or the heating ducts.

  • A room that is truly ready

    We finish with wiped surfaces and passing air results, not just bare studs and an empty floor.

  • Scope set by the lab
  • HEPA-scrubbed enclosure
  • Soaked, never dry
  • Outside air test

Is Asbestos Standing Between You and Your Remodel?

Tell us which rooms are being redone and what you have spotted. We can go over what deserves a sample, what removal involves and how to fit it around your builder's calendar.